Step by step
The phone call
You describe what you are seeing, the floors, the heating and anything you have already checked. The office explains how the survey would work at your property and books a date. Lines are open Monday to Friday, 7:30am to 6:30pm.
Arrival and a look round
The engineer asks what has happened, looks at the damage, the boiler, the manifold, the stopcock and the meter, and works out which systems run under the affected floor.
Which pipe is leaking
Each system is isolated and pressure tested: underfloor loops one at a time, radiator circuits, hot and cold supplies. A gauge that drops identifies the leaking pipe. This step often clears the underfloor heating.
Where the pipe runs
Thermal imaging maps heating and hot water pipes through the floor. Where there is no heat, the route is worked out from the fittings, the gas readings or the layout.
The spot on the pipe
Tracer gas, acoustic listening and moisture readings are used over the pipe route. The engineer keeps going until the methods agree on one place, and explains what each one showed.
Agreeing to open the floor
Before anything is lifted, the engineer shows you the spot and explains what opening it involves for your floor finish. Nothing is broken without your agreement.
Exposing and repairing the leak
The floor is opened at the marked spot. Where it can be done on the day, the pipe is repaired, the system retested and refilled. If it needs another visit or another trade, you are told why.
The report
You get a written report of the investigation: what was tested, what was found and where, and any recommendations. It can be sent to your insurer or loss adjuster.
How to prepare
- Clear furniture, rugs and anything stored on the floors involved, and in front of the boiler, manifold and stopcock.
- Find out where the water meter is and make sure it can be reached.
- Have any drawings, photos from when the floor was laid, or notes from earlier plumbers ready.
- If you are claiming on insurance, have the claim reference to hand.
- Ask the office whether to have the heating running before the visit. Warm pipes are easier to trace with a thermal camera, but a fast leak may mean keeping it off.
How long it takes
An engineer is booked for the day. Some leaks are found in the first couple of hours; large systems, pipes laid in rings or channels and leaks that have spread widely take longer, because each reading has to be checked against another before the floor is opened.


